This project extends the French Broad River Greenway from the French Broad River Park at Amboy Road to the New Belgium Brewing Company. The greenway is 10 feet wide with both asphalt and concrete surfaces.
Stewart’s services included greenway plans, signing plans, construction management plans and PS&E package.
Due to the terrain and river location, the design included a soldier pile wall and we paid close attention to the design in order to obtain a no-rise certification for the project.